Rockledge Lift Station and Sewer Line Rehabilitation Project
The Rockledge Lift Station and Sewer Line Rehabilitation Project will improve and replace the sewer collection system in the Rockledge neighborhood. The project involves replacement of gravity sewer pipes and one sewer force main in addition to sewer lift station improvements. The existing system was built in 1932 and partially upgraded in 1945, 1958, 1961 and 1975. The pipelines, pumps and the station itself are at the age where their design life has been exceeded. Video inspection shows size and material of pipelines are not up to current standards with mixed pipe diameters, broken joints and sharp transitions. The pump and controls in the lift station must be replaced to improve energy efficiency and reliability. A second pump must also be installed for redundancy in the event of pump failure.
Please call project manager Fred Shahidi at 949-497-0345 with questions regarding this project.